Skip To Content

Bozeman Development Opportunity | Urban + Farm

Development Opportunity: Phase 1 Block Sales

Outlaw Realty is delighted to present the Phase 1 opportunity at Urban + Farm in Bozeman, MT. Phase 1 consists of 8.72± acres located within the 106± acre Urban + Farm mixed-use and master-planned community situated in Bozeman’s growing west side.

The Phase 1 location is off Fallon St, across from the Norton Ranch subdivision, and provides an excellent opportunity for developers to build a total of 64 residential units, comprising 21 single-family homes and 43 townhomes.

Exceptional central Bozeman location with ease of connection to Montana State University (6 minutes), Four Corners employment hub (7 minutes), downtown Bozeman (8 minutes), Bozeman Yellowstone International Airport (20 minutes), Bridger Bowl Ski Area (30 minutes), Big Sky Resort (1 hour), and Yellowstone National Park (1.5 hours)

PHASE 1 PRELIMINARY PLAT – Single Family Lots

PHASE 1 PRELIMINARY PLAT – Multi-Family Lots

Outlaw Real Estate Partners has recently finished constructing and begun leasing out Millhouse East + West, which comprises 36 two-bedroom apartments. Additionally, the Seller is presently in the process of constructing The Grange, which will include 16 detached single-family homes and 6 rowhomes. The Seller plans to complete all the horizontal infrastructure for the rest of Urban + Farm development in phases, with completion set between the third quarter of 2023 and the third quarter of 2024.

What is Urban + Farm?

Urban + Farm is a ± 106-acre mixed-use agrihood in Bozeman setting a new precedent for vibrant, active, sustainable living. Anchoring West Bozeman, the “complete community” includes a mix of residential and commercial offerings with trail networks and an onsite vertical greenhouse adding unique functionality and aesthetic. Urban + Farm’s vision seeks to distinguish local neighborhood character, building on existing residential and commercial development in the area while honoring Gallatin Valley’s agricultural roots and sustainability – all with an eye for walkability and bike ability.

Project Status

Currently Millhouse East + West, 36 two-bedroom apartments, is currently finished and leased-up. The Grange, 16 detached single-family homes and 6 rowhomes, are partially finished with 10 units leased up. Outlaw Real Estate Partners will be completing all horizontal infrastructure for the remainder of the Urban + Farm development with phased completion between the third quarter of 2023 and third quarter of 2024. Currently available is the land for Fallon Lot 1, Mayfly, Phase I, and Phase II.

Trackback from your site.

Leave a Reply

*
*